Grevenbroich wind farm

In Grevenbroich, old turbines were replaced by new ones in 2016. The new machines have a capacity of 2.5 MW per turbine and therefore offer much better energy efficiency than the previous turbines.

TURBINES

2 GE Wind Energy 2.5 – 120

TOTAL REVENUE

5 MW

PROJECT START

Dezember 2016

CPC Germania Logo Hellblau

SERVICE

CONTACT

T: +49-5971-8608-55
F: +49-5971-8608-60

info@cpc-germania.com

MEMBER OF