In the municipality of Kaifenheim a wind farm consisting of three Vestas turbines was put into operation in 2016. Three V112 models, one with a hub height of 94m, and two with hub heights of 119m, have been steadily producing power since March 2016. The wind farm feeds its electricity to a transmission station 9 km away right next to the substation. The total output of the three turbines is 9.9 MW, which means they supply nearly 10,000 households with green electricity.

Kaifenheim wind farm

TURBINES

3 Vestas V112 – 3,3 MW

TOTAL REVENUE

9,9 MW

PROJECT START

März 2016

CPC Germania Logo Hellblau

SERVICE

CONTACT

T: +49-5971-8608-55
F: +49-5971-8608-60

info@cpc-germania.com