Pro­jects

Trust.

Suc­cess by experience.

Zeit_Erfahrung_2
Years
Expe­ri­ence
PL09-WEA
Turbines
instal­led
PV
Modules
instal­led
Strom_MW_Leistung_Blitz
Megawatts
pro­jec­ted Power

Our expe­ri­ence

In 1993, when the first serious wind ener­gy sys­tems began to emer­ge – at the time, main­ly 500 kW tur­bi­nes – an idea beca­me rea­li­ty: CPC Ger­ma­nia. The indus­try nee­ded stra­te­gists and plan­ners to get the tur­bi­nes available on the mar­ket into tan­gi­ble and pro­fi­ta­ble pro­jects. CPC Ger­ma­nia com­bi­nes the exper­ti­se of wind power pio­neers with the ide­as of young engi­neers, tech­ni­ci­ans and pro­fes­sio­nals. The result to date has been num­e­rous high­ly pro­fi­ta­ble pro­jects. Back in 1996, the Utgast wind farm with 41 x 600 kW tur­bi­nes was the lar­gest wind pro­ject in Ger­ma­ny, which we excee­ded in 2001 by about 25% of instal­led capa­ci­ty with the Alt­mark wind farm. Our expe­ri­ence was also incor­po­ra­ted into the Hüse­litz wind farm, which with its 113 MW sup­pli­es more than 100,000 house­holds with green electricity.

tabu­lar view