Our expeÂriÂence
In 1993, when the first serious wind enerÂgy sysÂtems began to emerÂge – at the time, mainÂly 500 kW turÂbiÂnes – an idea becaÂme reaÂliÂty: CPC GerÂmaÂnia. The indusÂtry neeÂded straÂteÂgists and planÂners to get the turÂbiÂnes available on the marÂket into tanÂgiÂble and proÂfiÂtaÂble proÂjects. CPC GerÂmaÂnia comÂbiÂnes the experÂtiÂse of wind power pioÂneers with the ideÂas of young engiÂneers, techÂniÂciÂans and proÂfesÂsioÂnals. The result to date has been numÂeÂrous highÂly proÂfiÂtaÂble proÂjects. Back in 1996, the Utgast wind farm with 41 x 600 kW turÂbiÂnes was the larÂgest wind proÂject in GerÂmaÂny, which we exceeÂded in 2001 by about 25% of instalÂled capaÂciÂty with the AltÂmark wind farm. Our expeÂriÂence was also incorÂpoÂraÂted into the HüseÂlitz wind farm, which with its 113 MW supÂpliÂes more than 100,000 houseÂholds with green electricity.